logo

Team Waloni Group

image
image

Mr. Yash Soni

Director (Finance Head)

image

Mr. Sumit Agrawal

Director (Marketing Head)

image

Mr. Ankit Agrawal

Director (Production Head)

image

Mr. Gaurav Soni

Director (Procurement Head)

image

Ms. Sristhi Agrawal

Company secretary

Some faq

Building Together Constructing Innovation Man

Dictum ultrices porttitor amet nec sollicitudin mi molestie adipiscing netus. Lorem at ac ut morbi ullamcorper molestie lacus. Euismod nulla viverra condimentum loren ipsum logo pack

A Pre-Engineered Building (PEB) is a modern steel structure designed and fabricated in a factory before being assembled at the project site. These buildings are highly durable, cost-effective, and faster to construct compared to traditional construction methods.

Waloni Group combines advanced engineering, quality steel fabrication, and timely project execution to deliver world-class PEB solutions. The company focuses on durability, modern design, and customer satisfaction.

Waloni Group provides PEB solutions for a wide range of projects including industrial sheds, warehouses, factories, logistics parks, commercial buildings, showrooms, and infrastructure developments.

PEB projects are completed much faster than conventional RCC construction because most components are pre-designed and factory-fabricated before reaching the site.

Yes, PEB structures are highly durable, weather-resistant, and designed to withstand heavy loads and harsh environmental conditions.